CheckaTy

Infrastructure projects

Infrastructure projects in DN40 (Immingham)

North East Lincolnshire · England

DN40 (Immingham) has 13 Nationally Significant Infrastructure Projects on record: A160 - A180 Port of Immingham Improvement, Able Marine Energy Park, Able Marine Energy Park Material Change 2 and 10 more. The centres of 203 of its 456 postcodes fall inside one.

Nationally Significant Infrastructure Projects
13
Postcodes inside
203 of 456

Nationally Significant Infrastructure Projects in DN40

  • A160 - A180 Port of Immingham Improvement
  • Able Marine Energy Park
  • Able Marine Energy Park Material Change 2
  • H2East Pipeline: Humber to Nottinghamshire
  • Hornsea Offshore Wind Farm (Zone 4) - Project One
  • Hornsea Offshore Wind Farm (Zone 4) - Project Two
  • Humber Carbon Capture Pipeline
  • Immingham Eastern Ro-Ro Terminal
  • Immingham Green Energy Terminal
  • North Killingholme Power Project
  • Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and…
  • Viking CCS Pipeline
  • VPI Immingham OCGT

Check infrastructure projects for one home in DN40

About these figures

These are major roads, railways, energy and water schemes decided by the government. Each is placed at the point the Planning Inspectorate publishes, so a long route can pass through other districts too. Areas are matched to the district by postcode centres, so this describes postcodes, not individual homes.

Source: Planning Inspectorate via planning.data.gov.uk. Figures built November 2026. This is information, not advice. See data sources and licences.

How the infrastructure projects check works for one home

More about DN40 (Immingham)

Infrastructure projects nearby